NRWW

= projects in operation 

= projects under construction 

= number of wind turbines 

= green power plant based on non-recyclable wood waste

Onshore wind in Belgium

Biogas and hydroelectric power

Non-recyclable wood waste

Offshore wind

Onshore wind abroad

View both projects on our website.

25 MW

green heat

20 MW

green power

A&U Energie

55,000

households

180,000

tonnes of non-recyclable wood waste

A&S Energie

The raw material for the new plant is also non-recyclable wood waste that is supplied locally. But A&U Energie also produces green heat (steam) alongside green power (electricity). The green power is partly supplied to Unilin and partly to the grid. The green heat is supplied to the nearby companies Unilin and Agristo. The plant has a thermal capacity of 90MW, through which 20MW of green power and 25MW of green heat is supplied.

NON-RECYCLABLE WOOD WASTE

In 2005, the Aspiravi group's Board of Directors decided, together with Spano (now Unilin), to develop, construct and operate a plant for the incineration of non-recyclable wood waste. A&S Energie in Oostrozebeke produced its first green power in 2010. Thanks to the annual processing of 180,000 tonnes of non-recyclable wood waste, renewable energy is produced for 55,000 households.

In 2016, the Aspiravi group's Board of Directors decided to explore with Unilin the possibility of setting up a second green power plant in Wielsbeke, in addition to a Unilin plant. After extensive research, it was decided at the beginning of 2018 to build this power station.


PROJECTS TO BE BUILT IN 2020

View our onshore projects in Belgium on our website.

At the port of Antwerp, Aspiravi NV is implementing projects on the right bank as a shareholder of Vleemo NV and on the left bank as a shareholder of Wind aan de Stroom NV. By early 2023, 67 wind turbines had been constructed in the port of Antwerp, resulting in a reduction of CO2 emissions by over 228,000 tonnes/year.

415,000

households

218

wind turbines

Onshore achievements in Belgium

VIDEO

Construction of Diest wind farm

View our project locations in Belgium here.

Aspiravi NV was a pioneering company in 2002 for the implementation of onshore wind energy projects in Belgium and began with 35 wind turbines, generating 12MW combined. In early 2023, the company was involved in the operation of 218 onshore wind turbines in Belgium, which together have an installed capacity of 602MW and produce green electricity for almost 415,000 households.

In the province of Limburg, Aspiravi NV is active as a shareholder of the companies Limburg win(d)t NV and Lommel win(d)t NV. In early 2023, 43% of the wind turbines in the province of Limburg had been implemented by the Aspiravi group. This equates to 54 wind turbines in total that together produce green electricity for approximately 70,000 Limburg households.

ONSHORE WIND IN BELGIUM

30% of today's energy
consumption on Curaçao is
produced by wind energy.

View our projects abroad on our website.

In 2011/2012, the first two wind farms were developed and constructed abroad on the island of Curaçao, with a third added in 2017. Today, the Aspiravi group operates a total of 15 wind turbines that together produce enough green energy for 53,000 households.

The wind turbines are truly necessary for the island's energy supply.

53,000

households

15

wind turbines

Achievements abroad

VIDEO

Blade inspection at Tera Kora I and Tera Kora II wind farms

The Aspiravi group has been active abroad since 2010/2011. It is always seeking projects with an acceptable level of risk that can be developed together with a local partner.

Aspiravi is currently taking initiatives to develop renewable energy projects in France, Spain, Bosnia and Herzegovina and Scotland. In each of these countries, the Aspiravi group is investigating how it can contribute to local energy transitions and climate objectives, with a view to developing and implementing concrete projects for the long term.

ONSHORE WIND ABROAD

In 2019, SeaMade, of which Aspiravi group is a shareholder, began construction of two new offshore wind farms: Seastar (30 wind turbines) and Mermaid (28 wind turbines). Together, both wind farms produce green electricity equivalent to the average amount consumed by 485,000 families.

The four offshore wind farms in which the Aspiravi group is involved help to cut an annual 1,3 million tonnes of CO2 emissions.

View our offshore projects on our website.

1,015,000

households

172

wind turbines

Offshore achievements

VIDEO

Construction of Rentel wind farm

In the Belgian territorial waters of the North Sea, the government defined an initial zone for the development of wind energy projects in the early 2000s. Within this zone, nine domain concessions have been granted for the construction of an equal number of wind farms. In 2005/2006, the Aspiravi group’s Board of Directors also decided to expand its activities and build offshore wind projects in the Belgian North Sea.

In 2013/2014, the Aspiravi group was involved in the construction of 72 wind turbines for the offshore project Northwind, and in 2018/2019 in the construction of 42 offshore wind turbines for the project Rentel. Both offshore wind farms together produce green power for the average annual consumption of 530,000 households.


OFFSHORE WIND

CATEGORIES

Each project, irrespective of its current phase (in initiation, under construction, in operation), has a project page on the Aspiravi website where all the information relating to the project can be found.

OVERVIEW OF ALL ACHIEVEMENTS
BY CATEGORY

PROJECTS TO BE BUILT IN 2023

View the projects to be built in 2023 here

49,900

households

78,5

MW

18

new wind turbines

Projects to be built by Aspiravi

Be sure to follow the construction of our various projects via our Instagram and LinkedIn accounts and share our posts with your network.

Part of our schedule for 2023 is the construction of a new wind turbine in Pelt Nolimpark. Moreover, there will be another six Aspiravi wind turbines in Flanders: two on the sites of frozen food company Timfrost in Oostkamp and as well as 2 in the loops of the interchange in Oostkamp and one wind turbine at each of the following locations: in Hoogstraten near the E19 motorway, in Aalst along the E40 motorway, in Ninove and Denderleeuw along the N45.  Finally, in Wallonia, we are building nine wind turbines in Sainte-Ode (5), Fernelmont (2) and Perwez (2).

PROJECTS
TO BE BUILT
IN 2023

PROJECTS BUILT IN 2019

View the projects built in 2019 here.

In 2022 we realized the construction of 26 new wind turbines spread over 9 locations. We built in Ardooie (1) near the frozen food company d'Arta, Ruddervoorde (2), Wervik (3), on Linkeroever in the port of Antwerp (2), Brecht (1), Bekkevoort (2), Diepenbeek (1), Ham (2) and Lommel (12).

Together, all the new projects provide a growth of 871.1 MW of installed capacity, this is green power for the average annual consumption of 60,600 families. Together, the 26 new wind turbines avoid annual emissions of 101,200 tons of CO2.

Completed projects in 2022

Core figures

dedicated employees

+70

citizen co-operants

13.000

avoided CO2 emissions/year

2 million tonnes

families

1.5 million

installed capacity

1.6 GW

wind turbines

405

20 years the Aspiravi-group, a fully Belgian-owned producer and supplier of green electricity and heat

In 2002, the Aspiravi Group started out with 35 wind turbines, good for 12 MW of green energy capacity. In 2005, the group was awarded the franchise for the construction of the 1st offshore wind farm, which was built in 2013/2014. Also in 2005, the Aspiravi group's Board of Directors decided to diversify by building the 1st power station for non-recyclable wood waste, which was implemented in 2010. In 2012, the group finally built its 1st wind energy project abroad. For 20 years, the Aspiravi Group has been contributing to the production of green electricity and heat equivalent to the average annual consumption of 1.5 million families.

IS BLOWING

WAY THE WIND

Read more

We KNOW WHICH

Our achievements

See the overview of all the projects on our website.

PROJECTS BUILT IN 2019

IS BLOWING

PROJECTS TO BE BUILT IN 2023

Be sure to follow the construction of our various projects via our Instagram and LinkedIn accounts and share our posts with your network.

49,900

households

78,5

MW

18

new wind turbines

Projects to be built by Aspiravi

Part of our schedule for 2023 is the construction of a new wind turbine in Pelt Nolimpark. Moreover, there will be another six Aspiravi wind turbines in Flanders: two on the sites of frozen food company Timfrost in Oostkamp and as well as 2 in the loops of the interchange in Oostkamp and one wind turbine at each of the following locations: in Hoogstraten near the E19 motorway, in Aalst along the E40 motorway, in Ninove and Denderleeuw along the N45.  Finally, in Wallonia, we are building nine wind turbines in Sainte-Ode (5), Fernelmont (2) and Perwez (2).

PROJECTS
TO BE BUILT
IN 2023

In 2022 we realized the construction of 26 new wind turbines spread over 9 locations. We built in Ardooie (1) near the frozen food company d'Arta, Ruddervoorde (2), Wervik (3), on Linkeroever in the port of Antwerp (2), Brecht (1), Bekkevoort (2), Diepenbeek (1), Ham (2) and Lommel (12).

Together, all the new projects provide a growth of 871.1 MW of installed capacity, this is green power for the average annual consumption of 60,600 families. Together, the 26 new wind turbines avoid annual emissions of 101,200 tons of CO2.

Completed projects in 2022

See the overview of all the projects on our website.

dedicated employees

+70

Core figures

citizen co-operants

13.000

tonnes avoided CO2 emissions/year

2 million tonnes

households

1.5 million

installed capacity

1.6 GW

wind turbines

405

20 years the Aspiravi-group, a fully Belgian-owned producer and supplier of green electricity and heat

In 2002, the Aspiravi Group started out with 35 wind turbines, good for 12 MW of green energy capacity. In 2005, the group was awarded the franchise for the construction of the 1st offshore wind farm, which was built in 2013/2014. Also in 2005, the Aspiravi group's Board of Directors decided to diversify by building the 1st power station for non-recyclable wood waste, which was implemented in 2010. In 2012, the group finally built its 1st wind energy project abroad. For 20 years, the Aspiravi Group has been contributing to the production of green electricity and heat equivalent to the average annual consumption of 1.5 million families.

WAY THE WIND

Our achievements

We KNOW WHICH

451,000

households

53.000

gezinnen

218

windturbines

Onshore achievements in Belgium

30% of today's energy
consumption on Curaçao is produced by wind energy.

Biogas and hydroelectric power
Non-recyclable wood waste
Offshore wind
Onshore wind abroad
Onshore wind in Belgium

OVERZICHT VAN ALLE REALISATIES
PER CATEGORIE

OVERVIEW OF ALL ACHIEVEMENTS BY CATEGORY

VIDEO

Construction of Diest wind farm

View our project locations in Belgium here.

Aspiravi NV was a pioneering company in 2002 for the implementation of onshore wind energy projects in Belgium and began with 35 wind turbines, generating 12MW combined. In early 2023, the company was involved in the operation of 218 onshore wind turbines in Belgium, which together have an installed capacity of 602MW and produce green electricity for almost 415,000 households.

In the province of Limburg, Aspiravi NV is active as a shareholder of the companies Limburg win(d)t NV and Lommel win(d)t NV. In early 2023, 43% of the wind turbines in the province of Limburg had been implemented by the Aspiravi group. This equates to 54 wind turbines in total that together produce green electricity for approximately 70,000 Limburg households.

ONSHORE WIND IN BELGIUM

Each project, irrespective of its current phase (in initiation, under construction, in operation), has a project page on the Aspiravi website where all the information relating to the project can be found.

OVERVIEW OF ALL ACHIEVEMENTS BY CATEGORY

View both projects on our website.

green power

green heat

25 MW

groene warmte

20 MW

groene stroom

A&U Energie

55,000

households

55.000

gezinnen

180,000

tonnes of non-recyclable wood waste

180.000

niet-recycleerbaar houtafval

A&S Energie

The raw material for the new plant is also non-recyclable wood waste that is supplied locally. But A&U Energie also produces green heat (steam) alongside green power (electricity). The green power is partly supplied to Unilin and partly to the grid. The green heat is supplied to the nearby companies Unilin and Agristo. The plant has a thermal capacity of 90MW, through which 20MW of green power and 25MW of green heat is supplied.

NON-RECYCLABLE WOOD WASTE

In 2005, the Aspiravi group's Board of Directors decided, together with Spano (now Unilin), to develop, construct and operate a plant for the incineration of non-recyclable wood waste. A&S Energie in Oostrozebeke produced its first green power in 2010. Thanks to the annual processing of 180,000 tonnes of non-recyclable wood waste, renewable energy is produced for 55,000 households.

In 2016, the Aspiravi group's Board of Directors decided to explore with Unilin the possibility of setting up a second green power plant in Wielsbeke, in addition to a Unilin plant. After extensive research, it was decided at the beginning of 2018 to build this power station.



View our offshore projects on our website.

1,015,000

households

53.000

gezinnen

172

wind turbines

Offshore achievements

VIDEO

Construction of Rentel wind farm

The four offshore wind farms in which the Aspiravi group is involved help to cut an annual 1,3 million tonnes of CO2 emissions.

In 2019, SeaMade, of which Aspiravi group is a shareholder, began construction of two new offshore wind farms: Seastar (30 wind turbines) and Mermaid (28 wind turbines). Together, both wind farms produce green electricity equivalent to the average amount consumed by 485,000 families.

OFFSHORE WIND


In the Belgian territorial waters of the North Sea, the government defined an initial zone for the development of wind energy projects in the early 2000s. Within this zone, nine domain concessions have been granted for the construction of an equal number of wind farms. In 2005/2006, the Aspiravi group’s Board of Directors also decided to expand its activities and build offshore wind projects in the Belgian North Sea.

In 2013/2014, the Aspiravi group was involved in the construction of 72 wind turbines for the offshore project Northwind, and in 2018/2019 in the construction of 42 offshore wind turbines for the project Rentel. Both offshore wind farms together produce green power for the average annual consumption of 530,000 households.


View our projects abroad on our website.

VIDEO

Blade inspection at Tera Kora I and Tera Kora II wind farms

In 2011/2012, the first two wind farms were developed and constructed abroad on the island of Curaçao, with a third added in 2017. Today, the Aspiravi group operates a total of 15 wind turbines that together produce enough green energy for 53,000 households.

The wind turbines are truly necessary for the island's energy supply.

53,000

households

53.000

gezinnen

15

wind turbines

Achievements abroad

The Aspiravi group has been active abroad since 2010/2011. It is always seeking projects with an acceptable level of risk that can be developed together with a local partner.

Aspiravi is currently taking initiatives to develop renewable energy projects in France, Spain, Bosnia and Herzegovina and Scotland. In each of these countries, the Aspiravi group is investigating how it can contribute to local energy transitions and climate objectives, with a view to developing and implementing concrete projects for the long term.

ONSHORE WIND ABROAD

View our project locations in Belgium here.

At the port of Antwerp, Aspiravi NV is implementing projects on the right bank as a shareholder of Vleemo NV and on the left bank as a shareholder of Wind aan de Stroom NV. By early 2023, 67 wind turbines had been constructed in the port of Antwerp, resulting in a reduction of CO2 emissions by over 228,000 tonnes/year.